The first tunnel element of the Fehmarnbelt Tunnel was immersed on the Danish side this week marking a key construction milestone in the long-running effort to create a fixed link between continental Europe and Scandinavia.

  • testaccount372920@piefed.zip
    link
    fedilink
    English
    arrow-up
    0
    ·
    5 days ago

    That is great news. Hopefully the Germans hurry up with upgrading the rail and road connection between Hamburg and the tunnel.

  • AllNewTypeFace@leminal.space
    link
    fedilink
    English
    arrow-up
    0
    ·
    5 days ago

    Isn’t the long side of each segment meant to be parallel to the shore? I thought that the wide side was the one that had the tunnel openings.